ITAC Assessment: AM0871
ITAC logo
ITAC Assessment: AM0871
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Asphalt shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $50
M
to 100
M
# of Employees 92
Plant Area 100,000
ft2
Annual Production 16,046
ton
Production Hrs. Annual 8,568
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,584 7,301,275
kWh
Electricity Demand $99,536 13,759
kW-mo/yr
Electricity Fees $17,131 -
Natural Gas $269,360 63,318
MMBtu
TOTAL YEARLY COSTS $711,611
RECOMMENDED SAVINGS* $35,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $7,430 $10,320 - - - $7,430
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,840 $30 $5,650
117,700
kWh
$1,190
-
kW-mo/yr
- - - -
03 2.3212: Optimize plant power factor $6,228 $23,380 - $6,228
-
kW-mo/yr
- - - -
04 2.4314: Use synthetic lubricant $3,265 $500 $2,698
56,216
kWh
$567
-
kW-mo/yr
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,678 $1,280 $2,213
46,105
kWh
$465
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $1,890 $3,600 $1,890
39,300
kWh
- - - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,880 $2,700 $1,880
39,180
kWh
- - - - -
08 2.8121: Apply for tax-free status for energy purchases $3,600 $2,000 - - $720 - - $2,880
09 2.7142: Utilize higher efficiency lamps and/or ballasts $694 $588 $600
12,560
kWh
$130
-
kW-mo/yr
- - $(-36.0) -
10 2.7124: Make a practice of turning off lights when not needed $525 - $440
9,200
kWh
$85
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $35,030 $44,398 $15,371
320,261
kWh
$8,665
-
kW-mo/yr
$720 $7,430
-
MMBtu
$(-36.0) $2,880
TOTAL IMPLEMENTED $28,802 $21,018 $15,371
320,261
kWh
$2,437
-
kW-mo/yr
$720 $7,430
-
MMBtu
$(-36.0) $2,880
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs