Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Petroleum refining
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0505 #08 Y:2017 Insulate bare equipment $1,069 $1,882
SF0505 #07 Y:2017 Insulate bare equipment $3,828 $5,423
SF0505 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $26,675 $28,219
SF0505 #05 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $8,816 $6,103
SF0505 #04 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $14,325 $6,323
SF0505 #03 Y:2017 Use optimum size and capacity equipment $7,070 $1,651
SF0505 #02 Y:2017 Reduce the pressure of compressed air to the minimum required $486 $86
SF0505 #01 Y:2017 Utilize controls to operate equipment only when needed $23,294 $4,639
SD0532 #06 Y:2016 Repair and eliminate steam leaks $2,528 $1,000
SD0532 #05 Y:2016 Use most efficient type of electric motors $9,383 $14,410
SD0532 #04 Y:2016 Eliminate or reduce compressed air usage $13,093 $1,200
SD0532 #03 Y:2016 Re-use or recycle hot or cold process exhaust air $40,203 $13,575
SD0532 #02 Y:2016 Use waste heat from hot flue gases to preheat $46,280 $13,575
SD0532 #01 Y:2016 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $872,947 $2,778,600
UMS001 #04 Y:2011 Adjust burners for efficient operation $13,000 $15,000
UMS001 #03 Y:2011 Use waste heat from hot flue gases to preheat $938,000 $1,000,000
UMS001 #02 Y:2011 Reduce combustion air flow to optimum $782,000 $1,377,000
UMS001 #01 Y:2011 Analyze flue gas for proper air/fuel ratio $986,100 $900,000
WV0395 #10 Y:2009 Install occupancy sensors $485 $300
WV0395 #09 Y:2009 Install compressor air intakes in coolest locations $3,963 $1,941