ITAC Assessment: UU0272
ITAC logo
ITAC Assessment: UU0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Petroleum products
NAICS 324110: Petroleum Refineries
SIC 2911: Petroleum Refining
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 1,311,000
ft2
Annual Production 162,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,063 1,595,700
kWh
Electricity Demand $47,749 3,917
kW-mo/yr
Electricity Fees $21,807 -
Fuel Oil #4 $1,236,778 130,794
MMBtu
TOTAL YEARLY COSTS $1,383,397
RECOMMENDED SAVINGS* $272,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #4 Savings Personnel Changes Savings
01 2.8124: Hire energy manager $66,000 $13,000 $6,900
144,000
kWh
- - $111,100
-
MMBtu
$(-52,000.0)
02 2.2511: Insulate bare equipment $31,500 $18,800 - - - $31,500
-
MMBtu
-
03 2.1241: Reduce excessive boiler blowdown $20,800 $16,300 - - - $20,800
-
MMBtu
-
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $54,700 $110,000 - - - $54,700
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,950 $23,600 $7,390
154,000
kWh
$2,560
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,170 $26,600 $3,090
64,400
kWh
$1,080
-
kW-mo/yr
- - -
07 2.2135: Repair and eliminate steam leaks $62,900 $32,400 - - - $62,900
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $890 $410 $656
13,600
kWh
$234
-
kW-mo/yr
- - -
09 2.9114: Use solar heat to make electricty $18,600 $397,000 $18,600
387,000
kWh
- - - -
10 4.821: Pay bills on time to avoid late fees $2,750 $11,800 - - $2,750 - -
TOTAL RECOMMENDED $272,260 $649,910 $36,636
763,000
kWh
$3,874
-
kW-mo/yr
$2,750 $281,000
-
MMBtu
$(-52,000.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #4 Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs