Assessment Year | 2025 |
---|---|
Principal Product | Petroleum products |
NAICS | 324110: Petroleum Refineries |
SIC | 2911: Petroleum Refining |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
1,311,000
ft2
|
Annual Production | 162,500
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $77,063 | 1,595,700 |
kWh
|
$0.048 |
Electricity Demand | $47,749 | 3,917 |
kW-mo/yr
|
$12.19 |
Electricity Fees | $21,807 | - |
|
- |
Fuel Oil #4 | $1,236,778 | 130,794 |
MMBtu
|
$9.46 |
TOTAL YEARLY COSTS | $1,383,397 | |||
RECOMMENDED SAVINGS* | $272,260 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #4 Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8124: Hire energy manager | $66,000 | $13,000 |
$6,900
144,000
kWh
|
- | - |
$111,100
-
MMBtu
|
$(-52,000.0) | |
02 | 2.2511: Insulate bare equipment | $31,500 | $18,800 | - | - | - |
$31,500
-
MMBtu
|
- | |
03 | 2.1241: Reduce excessive boiler blowdown | $20,800 | $16,300 | - | - | - |
$20,800
-
MMBtu
|
- | |
04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $54,700 | $110,000 | - | - | - |
$54,700
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,950 | $23,600 |
$7,390
154,000
kWh
|
$2,560
-
kW-mo/yr
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,170 | $26,600 |
$3,090
64,400
kWh
|
$1,080
-
kW-mo/yr
|
- | - | - | |
07 | 2.2135: Repair and eliminate steam leaks | $62,900 | $32,400 | - | - | - |
$62,900
-
MMBtu
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $890 | $410 |
$656
13,600
kWh
|
$234
-
kW-mo/yr
|
- | - | - | |
09 | 2.9114: Use solar heat to make electricty | $18,600 | $397,000 |
$18,600
387,000
kWh
|
- | - | - | - | |
10 | 4.821: Pay bills on time to avoid late fees | $2,750 | $11,800 | - | - | $2,750 | - | - | |
TOTAL RECOMMENDED | $272,260 | $649,910 |
$36,636
763,000
kWh
|
$3,874
-
kW-mo/yr
|
$2,750 |
$281,000
-
MMBtu
|
$(-52,000.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #4 Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs