Assessment Year | 2007 |
---|---|
Principal Product | Push/pull control cables |
NAICS | 332618: Other Fabricated Wire Product Manufacturing |
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 104 |
Plant Area |
59,300
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $103,840 | 3,172,720 |
kWh
|
$0.033 |
Electricity Demand | $47,674 | 802 |
kW-mo/yr
|
$59.44 |
Electricity Fees | $7,373 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,977 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,324 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,324 | $10,082 |
$8,324
254,320
kWh
|
- | - | |
02 | 2.3212: Optimize plant power factor | $7,373 | $12,013 | - | - | $7,373 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,451 | $13,219 |
$3,504
107,070
kWh
|
$947
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,215 | $1,385 |
$846
25,779
kWh
|
$369
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $1,052 | $1,291 |
$768
23,457
kWh
|
$284
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $880 | $1,900 |
$880
26,907
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $682 | $553 |
$491
15,008
kWh
|
$191
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $23,977 | $40,443 |
$14,813
452,541
kWh
|
$1,791
-
kW-mo/yr
|
$7,373 | ||
TOTAL IMPLEMENTED | $8,324 | $10,082 |
$8,324
254,320
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs