ITAC Assessment: UW0001
ITAC logo
ITAC Assessment: UW0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Push/pull control cables
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 59,300
ft2
Annual Production 1
units
Production Hrs. Annual 5,460
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,840 3,172,720
kWh
Electricity Demand $47,674 802
kW-mo/yr
Electricity Fees $7,373 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,324

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,324 $10,082 $8,324
254,320
kWh
- -
02 2.3212: Optimize plant power factor $7,373 $12,013 - - $7,373
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,451 $13,219 $3,504
107,070
kWh
$947
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,215 $1,385 $846
25,779
kWh
$369
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $1,052 $1,291 $768
23,457
kWh
$284
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $880 $1,900 $880
26,907
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $682 $553 $491
15,008
kWh
$191
-
kW-mo/yr
-
TOTAL RECOMMENDED $23,977 $40,443 $14,813
452,541
kWh
$1,791
-
kW-mo/yr
$7,373
TOTAL IMPLEMENTED $8,324 $10,082 $8,324
254,320
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs