801
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Chemicals and chemical preparations, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2610 #09 Y:2026 | 09 | 2026 | Use solar heat to make electricty | $11,785 | $116,051 |
n/a
|
| UL2610 #08 Y:2026 | 08 | 2026 | Utilize higher efficiency lamps and/or ballasts | $2,565 | $11,013 |
n/a
|
| UL2610 #07 Y:2026 | 07 | 2026 | Install occupancy sensors | $102 | $386 |
n/a
|
| UL2610 #06 Y:2026 | 06 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,253 | $315 |
n/a
|
| UL2610 #05 Y:2026 | 05 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $9,804 | $6,617 |
n/a
|
| UL2610 #04 Y:2026 | 04 | 2026 | Optimize plant power factor | $5,290 | $26,000 |
n/a
|
| UL2610 #03 Y:2026 | 03 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $6,056 | - |
n/a
|
| UL2610 #02 Y:2026 | 02 | 2026 | Insulate bare equipment | $2,011 | $1,050 |
n/a
|
| UL2610 #01 Y:2026 | 01 | 2026 | Re-size charging openings or add a movable door on equipment | $286 | $500 |
n/a
|
| UU0302 #09 Y:2026 | 09 | 2026 | Pay bills on time to avoid late fees | $970 | $1,000 |
n/a
|
| UU0302 #08 Y:2026 | 08 | 2026 | Lower temperature during the winter season and vice-versa | $510 | $1,610 |
n/a
|
| UU0302 #07 Y:2026 | 07 | 2026 | Lower temperature during the winter season and vice-versa | $8,450 | $11,400 |
n/a
|
| UU0302 #06 Y:2026 | 06 | 2026 | Install timers and/or thermostats | $1,290 | $1,800 |
n/a
|
| UU0302 #05 Y:2026 | 05 | 2026 | Use less wasteful packaging | $14,650 | $44,660 |
n/a
|
| UU0302 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $880 | $740 |
n/a
|
| UU0302 #03 Y:2026 | 03 | 2026 | Use battery storage for demand control | $9,420 | $20,000 |
n/a
|
| UU0302 #02 Y:2026 | 02 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $5,000 | $9,600 |
n/a
|
| UU0302 #01 Y:2026 | 01 | 2026 | Interlock heating and air conditioning systems to prevent simultaneous operation | $103,610 | $100,000 |
n/a
|
| UU0298 #12 Y:2026 | 12 | 2026 | Reduce ventilation air | $140 | $120 |
n/a
|
| UU0298 #11 Y:2026 | 11 | 2026 | Pay bills on time to avoid late fees | $314 | $240 |
n/a
|