56
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Chemicals and chemical preparations, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1056 #12 Y:2023 | 12 | 2023 | Use solar heat to make electricty | $15,983 | $148,109 | |
| UD1056 #11 Y:2023 | 11 | 2023 | Install vinyl strip / high speed / air curtain doors | $228 | $368 | |
| UD1056 #10 Y:2023 | 10 | 2023 | Reduce illumination to minimum necessary levels | $1,229 | - | |
| UD1056 #09 Y:2023 | 09 | 2023 | Install occupancy sensors | $7,204 | $1,800 | |
| UD1056 #08 Y:2023 | 08 | 2023 | Utilize higher efficiency lamps and/or ballasts | $23,824 | - | |
| UD1056 #07 Y:2023 | 07 | 2023 | Repair or replace steam traps | $7,938 | $800 | |
| UD1056 #06 Y:2023 | 06 | 2023 | Analyze flue gas for proper air/fuel ratio | $3,784 | - | |
| UD1056 #05 Y:2023 | 05 | 2023 | Install motor voltage controller on lightly loaded motors | $17,114 | $3,100 | |
| UD1056 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $36,442 | - | |
| UD1056 #03 Y:2023 | 03 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $1,193 | - | |
| UD1056 #02 Y:2023 | 02 | 2023 | Reduce the pressure of compressed air to the minimum required | $2,573 | - | |
| UD1056 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,474 | $250 | |
| UD0887 #13 Y:2013 | 13 | 2013 | Turn off equipment when not in use | $383 | - | |
| UD0887 #12 Y:2013 | 12 | 2013 | Utilize energy-efficient belts and other improved mechanisms | $500 | - | |
| UD0887 #11 Y:2013 | 11 | 2013 | Develop a repair/replace policy | $2,637 | $3,420 | |
| UD0887 #10 Y:2013 | 10 | 2013 | Use heat in flue gases to preheat products or materials | $187 | $300 | |
| UD0887 #09 Y:2013 | 09 | 2013 | Analyze flue gas for proper air/fuel ratio | $5,136 | $4,000 | |
| UD0887 #08 Y:2013 | 08 | 2013 | Reschedule plant operations or reduce load to avoid peaks | $10,244 | - | |
| UD0887 #07 Y:2013 | 07 | 2013 | Optimize plant power factor | $19,173 | $10,000 | |
| UD0887 #06 Y:2013 | 06 | 2013 | Add area lighting switches | $594 | $350 |