Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and chemical preparations, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1056 #12 Y:2023 Use solar heat to make electricty $15,983 $148,109
UD1056 #11 Y:2023 Install vinyl strip / high speed / air curtain doors $228 $368
UD1056 #10 Y:2023 Reduce illumination to minimum necessary levels $1,229 -
UD1056 #09 Y:2023 Install occupancy sensors $7,204 $1,800
UD1056 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $23,824 -
UD1056 #07 Y:2023 Repair or replace steam traps $7,938 $800
UD1056 #06 Y:2023 Analyze flue gas for proper air/fuel ratio $3,784 -
UD1056 #05 Y:2023 Install motor voltage controller on lightly loaded motors $17,114 $3,100
UD1056 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $36,442 -
UD1056 #03 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,193 -
UD1056 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $2,573 -
UD1056 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,474 $250
UD0887 #13 Y:2013 Turn off equipment when not in use $383 -
UD0887 #12 Y:2013 Utilize energy-efficient belts and other improved mechanisms $500 -
UD0887 #11 Y:2013 Develop a repair/replace policy $2,637 $3,420
UD0887 #10 Y:2013 Use heat in flue gases to preheat products or materials $187 $300
UD0887 #09 Y:2013 Analyze flue gas for proper air/fuel ratio $5,136 $4,000
UD0887 #08 Y:2013 Reschedule plant operations or reduce load to avoid peaks $10,244 -
UD0887 #07 Y:2013 Optimize plant power factor $19,173 $10,000
UD0887 #06 Y:2013 Add area lighting switches $594 $350