Assessment Year | 2025 |
---|---|
Principal Product | Silicone Products |
NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
110,000
ft2
|
Annual Production | 6,614
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $135,872 | 1,190,860 |
kWh
|
$0.11 | |
Electricity Demand | $40,811 | 3,418 |
kW-mo/yr
|
$11.94 | |
Electricity Fees | $6,749 | - |
|
- | |
Natural Gas | $48,829 | 8,587 |
MMBtu
|
$5.69 | |
Other Gas | $3,883 | 1 |
MMBtu
|
$3,883.00 | |
Waste Disposal Costs | |||||
Water Usage | $25,031 | 2 |
Tgal
|
$11,615.31 | |
TOTAL YEARLY COSTS | $261,175 | ||||
RECOMMENDED SAVINGS* | $30,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $20,533 | $184,800 |
$20,533
180,111
kWh
|
- | - | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $6,046 | - | - | - | - | $6,046 | |
03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $729 | $7,330 | - | - | - | $729 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $65 | $140 |
$54
491
kWh
|
$11
-
kW-mo/yr
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $2,223 | - |
$1,802
16,384
kWh
|
$421
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $68 | $404 |
$46
415
kWh
|
$23
-
kW-mo/yr
|
- | - | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $1,235 | $166 |
$610
5,354
kWh
|
$373
-
kW-mo/yr
|
$252
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $30,900 | $192,840 |
$23,045
202,755
kWh
|
$828
-
kW-mo/yr
|
$252
-
MMBtu
|
$6,775 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs