ITAC Assessment: WI0189
ITAC logo
ITAC Assessment: WI0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Printing on Plastics
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 85,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,800
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,827 4,557,737
kWh
Natural Gas $59,388 25,889
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,491

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $9,676 $16,000 $9,676
187,866
kWh
-
02 2.7135: Install occupancy sensors $14,825 $24,000 $14,825
415,006
kWh
-
03 2.3132: Recharge batteries on during off-peak demand periods $1,897 $525 $1,897
36,928
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $990 - $990
-
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $678 $640 $678
13,189
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $476 $700 - $476
-
MMBtu
07 2.2511: Insulate bare equipment $148 - $148
2,931
kWh
-
08 2.2511: Insulate bare equipment $611 $360 - $611
-
MMBtu
TOTAL RECOMMENDED $29,301 $42,225 $28,214
655,920
kWh
$1,087
-
MMBtu
TOTAL IMPLEMENTED $25,491 $40,000 $25,491
602,872
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs