ITAC Assessment: DL0255
ITAC logo
ITAC Assessment: DL0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Liquid and powdered sodium silicate
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 25
Plant Area 97,000
ft2
Annual Production 67,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $452,988 6,093,069
kWh
Electricity Demand $85,502 12,390
kW-mo/yr
Electricity Fees $5,462 -
Natural Gas $2,055,198 454,465
MMBtu
Waste Disposal Costs
Water Usage $173,729 58,100
Tgal
Water Disposal $139,050 15,000
Tgal
TOTAL YEARLY COSTS $2,911,929
RECOMMENDED SAVINGS* $387,623 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $3,259 $5,600 $3,259
43,449
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,638 $17,000 $7,638
89,900
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $246,492 $36,000 $46,492
475,825
kWh
- - $200,000
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,077 $15,000 $11,077
147,700
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,190 $5,500 $10,823
144,300
kWh
$1,368
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $18,300 $800 $18,300
243,900
kWh
- - -
07 2.2441: Preheat boiler makeup water with waste process heat $3,100 $25,000 - - $3,100
-
MMBtu
-
08 2.1116: Improve combustion control capability $76,162 $42,000 - - $76,162
-
MMBtu
-
09 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $9,008 - - - $9,008
-
MMBtu
-
10 2.7232: Replace existing hvac unit with high efficiency model $397 $55,182 $345
4,604
kWh
$52
-
kW-mo/yr
- -
TOTAL RECOMMENDED $387,623 $202,082 $97,934
1,149,678
kWh
$1,420
-
kW-mo/yr
$88,270
-
MMBtu
$200,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs