ITAC Assessment: LE0567
ITAC logo
ITAC Assessment: LE0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastics Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 50,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 4,992
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,382 1,147,587
kWh
Electricity Demand $22,362 6,235
kW-mo/yr
Electricity Fees $5,096 -
Natural Gas $56,489 4,762
MMBtu
TOTAL YEARLY COSTS $231,329
RECOMMENDED SAVINGS* $71,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7261: Install timers and/or thermostats $1,055 $600 - - $1,055
-
MMBtu
-
02 2.4157: Establish a predictive maintenance program $54,396 $50,000 - - - $54,396
03 2.6212: Turn off equipment during breaks, reduce operating time $5,776 $9,000 $5,005
39,102
kWh
$771
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $892 $1,500 $892
6,969
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $226 $1,056 $198
1,544
kWh
$28
-
kW-mo/yr
- -
06 2.7232: Replace existing hvac unit with high efficiency model $8,772 $43,016 $8,506
66,454
kWh
$266
-
kW-mo/yr
- -
TOTAL RECOMMENDED $71,117 $105,172 $14,601
114,069
kWh
$1,065
-
kW-mo/yr
$1,055
-
MMBtu
$54,396
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs