Assessment Year | 1992 |
---|---|
Principal Product | ORIGINAL AUTO EQUIPMENT |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 56 |
Plant Area |
n/a
|
Annual Production | 1,100,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,024 | 1,324,150 |
kWh
|
$0.10 |
Fuel Oil #2 | $2,811 | 538 |
MMBtu
|
$5.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,146 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,535 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,557 | $1,707 |
$1,557
15,533
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,080 | $400 |
$8,080
79,719
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,675 | - |
$2,945
29,015
kWh
|
- | - | $(-270.0) | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,278 | $250 |
$2,278
22,567
kWh
|
- | - | - | |
05 | 2.7492: Use proper thickness of insulation on building envelope | $232 | $300 | - | - |
$232
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $223 | $400 | - | - |
$223
-
MMBtu
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $101 | - |
$164
1,758
kWh
|
$(-63.0)
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $15,146 | $3,057 |
$15,024
148,592
kWh
|
$(-63.0)
-
MMBtu
|
$455
-
MMBtu
|
$(-270.0) | ||
TOTAL IMPLEMENTED | $8,535 | $1,100 |
$8,080
79,719
kWh
|
- |
$455
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs