ITAC Assessment: ND0020
ITAC logo
ITAC Assessment: ND0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ORIGINAL AUTO EQUIPMENT
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area
n/a
Annual Production 1,100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,024 1,324,150
kWh
Fuel Oil #2 $2,811 538
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,557 $1,707 $1,557
15,533
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,080 $400 $8,080
79,719
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,675 - $2,945
29,015
kWh
- - $(-270.0)
04 2.4221: Install compressor air intakes in coolest locations $2,278 $250 $2,278
22,567
kWh
- - -
05 2.7492: Use proper thickness of insulation on building envelope $232 $300 - - $232
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $223 $400 - - $223
-
MMBtu
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $101 - $164
1,758
kWh
$(-63.0)
-
MMBtu
- -
TOTAL RECOMMENDED $15,146 $3,057 $15,024
148,592
kWh
$(-63.0)
-
MMBtu
$455
-
MMBtu
$(-270.0)
TOTAL IMPLEMENTED $8,535 $1,100 $8,080
79,719
kWh
- $455
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs