Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Printing ink
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0973 #07 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $27,850 $175,000
GT0973 #06 Y:2023 Use solar heat to make electricty $25,481 $338,242
GT0973 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,586 $1,850
GT0973 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $305 $200
GT0973 #03 Y:2023 Pay utility bills on time $689 $200
GT0973 #02 Y:2023 Conserve energy by efficient use of vending machines $394 $90
GT0973 #01 Y:2023 Apply for tax-free status for energy purchases $7,645 $800
IP0178 #04 Y:2023 Replace boiler $5,185 $20,824
IP0178 #03 Y:2023 Use / purchase optimum sized compressor $2,674 $4,752
IP0178 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,293 $2,142
IP0178 #01 Y:2023 Reduce illumination to minimum necessary levels $6,915 $824
UL2311 #09 Y:2023 Use solar heat to make electricty $83,941 $859,381
UL2311 #08 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $4,714 $9,750
UL2311 #07 Y:2023 Repair and eliminate steam leaks $3,418 $1,000
UL2311 #06 Y:2023 Use waste heat from hot flue gases to preheat $22,148 $29,250
UL2311 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $2,230 $1,980
UL2311 #04 Y:2023 Reduce illumination to minimum necessary levels $1,735 -
UL2311 #03 Y:2023 Use separate switches on perimeter lighting which may be turned off when natural light is available $4,286 $1,600
UL2311 #02 Y:2023 Install occupancy sensors $2,078 $2,711
UL2311 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $10,819 $13,218