ITAC Assessment: UL2311
ITAC logo
ITAC Assessment: UL2311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Printing Ink
NAICS 325910: Printing Ink Manufacturing
SIC 2893: Printing Ink
Sales Range $100
M
to 500
M
# of Employees 72
Plant Area 350,000
ft2
Annual Production 140,526,270
lb
Production Hrs. Annual 7,280
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $624,478 11,433,139
kWh
Electricity Demand $157,386 24,304
kW-mo/yr
Electricity Fees $416,751 -
Natural Gas $347,286 50,800
MMBtu
Waste Disposal Costs
Water Usage $12,094 1,738
Tgal
TOTAL YEARLY COSTS $1,557,995
RECOMMENDED SAVINGS* $135,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,819 $13,218 $8,829
161,643
kWh
$1,990
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $2,078 $2,711 $2,078
37,773
kWh
- -
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $4,286 $1,600 $4,286
78,467
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $1,735 - $1,458
26,687
kWh
$277
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,230 $1,980 $2,230
40,536
kWh
- -
06 2.2414: Use waste heat from hot flue gases to preheat $22,148 $29,250 - - $22,148
-
MMBtu
07 2.2135: Repair and eliminate steam leaks $3,418 $1,000 - - $3,418
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,714 $9,750 $4,714
86,303
kWh
- -
09 2.9114: Use solar heat to make electricty $83,941 $859,381 $69,492
1,263,492
kWh
$14,449
-
kW-mo/yr
-
TOTAL RECOMMENDED $135,369 $918,890 $93,087
1,694,901
kWh
$16,716
-
kW-mo/yr
$25,566
-
MMBtu
TOTAL IMPLEMENTED $20,753 $17,798 $15,345
280,646
kWh
$1,990
-
kW-mo/yr
$3,418
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs