ITAC Assessment: IP0178
ITAC logo
ITAC Assessment: IP0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Ink/Warehousing
NAICS 325910: Printing Ink Manufacturing
SIC 2893: Printing Ink
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 300,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 3,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,391 1,709,501
kWh
Electricity Demand $136,800 6,000
kW-mo/yr
Electricity Fees $29,941 -
Natural Gas $47,051 5,046
MMBtu
TOTAL YEARLY COSTS $340,183
RECOMMENDED SAVINGS* $18,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $6,915 $824 $3,085
41,748
kWh
$3,830
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,293 $2,142 $3,293
44,554
kWh
- -
03 2.4226: Use / purchase optimum sized compressor $2,674 $4,752 $1,443
19,530
kWh
$1,231
-
kW-mo/yr
-
04 2.1224: Replace boiler $5,185 $20,824 - - $5,185
-
MMBtu
TOTAL RECOMMENDED $18,067 $28,542 $7,821
105,832
kWh
$5,061
-
kW-mo/yr
$5,185
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs