Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pesticides and agricultural chemicals, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LL0145 #04 Y:2002 Install occupancy sensors $486 $104
LL0145 #03 Y:2002 Optimize plant power factor $5,861 $6,125
LL0145 #02 Y:2002 Reduce illumination to minimum necessary levels $6,323 -
LL0145 #01 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $11,490 $1,350
IC0002 #06 Y:2001 Add equipment/ operators to reduce production bottleneck $730,000 $2,950,000
IC0002 #05 Y:2001 Utilize higher efficiency lamps and/or ballasts $19,521 $95,073
IC0002 #04 Y:2001 Use most efficient type of electric motors $552 $979
IC0002 #03 Y:2001 Install compressor air intakes in coolest locations $770 $500
IC0002 #02 Y:2001 Reduce the pressure of compressed air to the minimum required $674 -
IC0002 #01 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $2,638 $600
IA0127 #08 Y:1995 Recover and reuse cooling water $1,647 $192
IA0127 #07 Y:1995 Direct warmest air to combustion intake $339 $250
IA0127 #06 Y:1995 Utilize energy-efficient belts and other improved mechanisms $117 $270
IA0127 #05 Y:1995 Use most efficient type of electric motors $1,030 $6,645
IA0127 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,298 $3,032
IA0127 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,523 $745
IA0127 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $5,234 $162
IA0127 #01 Y:1995 Purchase gas directly from a contract gas supplier $33,563 $4,200
KU0394 #09 Y:1993 Install compressor air intakes in coolest locations $342 $176
KU0394 #08 Y:1993 Make a practice of turning off lights when not needed $1,106 $2,346