ITAC Assessment: IA0127
ITAC logo
ITAC Assessment: IA0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product agricultural chemicals
NAICS
n/a
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 110,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,542 1,501,759
kWh
Natural Gas $110,278 31,077
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $33,563 $4,200 - - - $33,563
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,234 $162 $5,234
102,579
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,523 $745 $1,523
29,894
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,298 $3,032 $1,298
25,498
kWh
- - -
05 2.4133: Use most efficient type of electric motors $1,030 $6,645 $1,030
20,223
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $117 $270 $117
2,345
kWh
- - -
07 2.1213: Direct warmest air to combustion intake $339 $250 - $339
-
MMBtu
- -
08 3.4115: Recover and reuse cooling water $1,647 $192 $(-33.0)
(-879)
kWh
- $1,680
-
Tgal
-
TOTAL RECOMMENDED $44,751 $15,496 $9,169
179,660
kWh
$339
-
MMBtu
$1,680
-
Tgal
$33,563
TOTAL IMPLEMENTED $7,911 $6,999 $6,231
121,923
kWh
- $1,680
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs