ITAC Assessment: WI0287
ITAC logo
ITAC Assessment: WI0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Steel and wire coils, metal lithography
NAICS
n/a
SIC 3516:
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 65,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,821 993,552
kWh
Electricity Demand $59,535 4,901
kW-mo/yr
Electricity Fees $3,539 -
Natural Gas $99,131 24,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 4.445: Install equipment to move product $71,155 $98,280 $(-6,138.0)
(-165,592)
kWh
$(-6,707.0)
-
kW-mo/yr
- - - - $86,400 $(-2,400.0) -
02 2.2437: Recover waste heat from equipment $27,837 $11,500 - - $27,837
-
MMBtu
- - - - - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,030 - - - - - $3,030
-
lb
- - - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,602 $5,000 - - - - - $1,602
-
lb
- - -
05 2.7261: Install timers and/or thermostats $1,279 $400 - - $1,279
-
MMBtu
- - - - - -
06 3.4113: Treat and reuse rinse waters $1,041 $1,475 - - - $1,041
-
Tgal
- - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $985 $30 $542
14,654
kWh
$443
-
kW-mo/yr
- - - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $439 $736 $220
5,862
kWh
$219
-
kW-mo/yr
- - - - - - -
09 4.321: Optimize production lot sizes and inventories $220 - - - - - - - - - $220
TOTAL RECOMMENDED $107,588 $117,421 $(-5,376.0)
(-145,076)
kWh
$(-6,045.0)
-
kW-mo/yr
$29,116
-
MMBtu
$1,041
-
Tgal
$3,030
-
lb
$1,602
-
lb
$86,400 $(-2,400.0) $220
TOTAL IMPLEMENTED $1,480 $2,211 $220
5,862
kWh
$219
-
kW-mo/yr
- $1,041
-
Tgal
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs