Assessment Year | 1997 |
---|---|
Principal Product | Steel and wire coils, metal lithography |
NAICS |
n/a
|
SIC | 3516: |
Sales Range | $10 M to 50M |
# of Employees | 39 |
Plant Area |
65,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 3,600
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,821 | 993,552 |
kWh
|
$0.037 |
Electricity Demand | $59,535 | 4,901 |
kW-mo/yr
|
$12.15 |
Electricity Fees | $3,539 | - |
|
- |
Natural Gas | $99,131 | 24,152 |
MMBtu
|
$4.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $107,588 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,480 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.445: Install equipment to move product | $71,155 | $98,280 |
$(-6,138.0)
(-165,592)
kWh
|
$(-6,707.0)
-
kW-mo/yr
|
- | - | - | - | $86,400 | $(-2,400.0) | - | |
02 | 2.2437: Recover waste heat from equipment | $27,837 | $11,500 | - | - |
$27,837
-
MMBtu
|
- | - | - | - | - | - | |
03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,030 | - | - | - | - | - |
$3,030
-
lb
|
- | - | - | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,602 | $5,000 | - | - | - | - | - |
$1,602
-
lb
|
- | - | - | |
05 | 2.7261: Install timers and/or thermostats | $1,279 | $400 | - | - |
$1,279
-
MMBtu
|
- | - | - | - | - | - | |
06 | 3.4113: Treat and reuse rinse waters | $1,041 | $1,475 | - | - | - |
$1,041
-
Tgal
|
- | - | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $985 | $30 |
$542
14,654
kWh
|
$443
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $439 | $736 |
$220
5,862
kWh
|
$219
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
09 | 4.321: Optimize production lot sizes and inventories | $220 | - | - | - | - | - | - | - | - | - | $220 | |
TOTAL RECOMMENDED | $107,588 | $117,421 |
$(-5,376.0)
(-145,076)
kWh
|
$(-6,045.0)
-
kW-mo/yr
|
$29,116
-
MMBtu
|
$1,041
-
Tgal
|
$3,030
-
lb
|
$1,602
-
lb
|
$86,400 | $(-2,400.0) | $220 | ||
TOTAL IMPLEMENTED | $1,480 | $2,211 |
$220
5,862
kWh
|
$219
-
kW-mo/yr
|
- |
$1,041
-
Tgal
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs