| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0201 #06 Y:2004 | 06 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $10,591 | $20,054 | |
| SU0201 #05 Y:2004 | 05 | 2004 | Utilize higher efficiency lamps and/or ballasts | $4,182 | $3,211 | |
| SU0201 #04 Y:2004 | 04 | 2004 | Utilize higher efficiency lamps and/or ballasts | $673 | $461 | |
| SU0201 #03 Y:2004 | 03 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,555 | $617 | |
| SU0201 #02 Y:2004 | 02 | 2004 | Install compressor air intakes in coolest locations | $2,094 | $142 | |
| SU0201 #01 Y:2004 | 01 | 2004 | Reduce the pressure of compressed air to the minimum required | $2,721 | - | |
| UF0348 #10 Y:2004 | 10 | 2004 | Utilize daylight whenever possible in lieu of artificial light | $3,760 | - | |
| UF0348 #09 Y:2004 | 09 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,977 | $456 | |
| UF0348 #08 Y:2004 | 08 | 2004 | Utilize higher efficiency lamps and/or ballasts | $2,203 | $6,441 | |
| UF0348 #07 Y:2004 | 07 | 2004 | Reduce the pressure of compressed air to the minimum required | $4,366 | - | |
| UF0348 #06 Y:2004 | 06 | 2004 | Size electric motors for peak operating efficiency | $39,206 | $74,000 | |
| UF0348 #05 Y:2004 | 05 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $10,420 | $22,100 | |
| UF0348 #04 Y:2004 | 04 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $4,169 | $10,500 | |
| UF0348 #03 Y:2004 | 03 | 2004 | Turn off equipment when not in use | $7,249 | - | |
| UF0348 #02 Y:2004 | 02 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $10,420 | $29,400 | |
| UF0348 #01 Y:2004 | 01 | 2004 | Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $1,333,121 | $2,700,000 | |
| MS0258 #12 Y:2004 | 12 | 2004 | Install / repair insulation on steam lines | $652 | $432 | |
| MS0258 #11 Y:2004 | 11 | 2004 | Install timers and/or thermostats | $917 | $236 | |
| MS0258 #10 Y:2004 | 10 | 2004 | Utilize higher efficiency lamps and/or ballasts | $1,287 | $1,192 | |
| MS0258 #09 Y:2004 | 09 | 2004 | Use photocell controls | $2,197 | $556 |