ITAC Assessment: MS0258
ITAC logo
ITAC Assessment: MS0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Agricultural Pesticides
NAICS 325320: Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 239,000
ft2
Annual Production 8,750
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,065 5,146,020
kWh
Electricity Demand $43,350 13,347
kW-mo/yr
Electricity Fees $74,051 -
Natural Gas $184,454 23,835
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $27,618 $3,865 - - - $27,618
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $17,390 $2,000 - - - $17,390
-
MMBtu
03 2.2121: Increase amount of condensate returned $17,029 $5,830 - - - $17,029
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $10,838 $7,618 - - - $10,838
-
MMBtu
05 2.2511: Insulate bare equipment $9,148 $698 - - - $9,148
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $8,547 $28,092 $5,146
120,137
kWh
- $3,401 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,220 $400 $4,950
115,552
kWh
- $3,270 -
08 2.7111: Reduce illumination to minimum necessary levels $4,706 $211 $2,153
50,269
kWh
$927
-
kW-mo/yr
$1,626 -
09 2.7134: Use photocell controls $2,197 $556 $1,323
30,877
kWh
- $874 -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,287 $1,192 $712
16,616
kWh
$86
-
kW-mo/yr
$489 -
11 2.7261: Install timers and/or thermostats $917 $236 $552
12,889
kWh
- $365 -
12 2.2136: Install / repair insulation on steam lines $652 $432 - - - $652
-
MMBtu
TOTAL RECOMMENDED $108,549 $51,130 $14,836
346,340
kWh
$1,013
-
kW-mo/yr
$10,025 $82,675
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs