ITAC Assessment: GT0946
ITAC logo
ITAC Assessment: GT0946
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product TABOREX 1108
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $5
M
to 10
M
# of Employees 22
Plant Area 45,220
ft2
Annual Production 3,776,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,232 2,910,600
kWh
TOTAL YEARLY COSTS $276,232
RECOMMENDED SAVINGS* $117,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2625: Chill water to the highest temperature possible $4,870 $250 $4,870
51,269
kWh
-
02 2.7135: Install occupancy sensors $16,405 $3,377 $16,405
172,681
kWh
-
03 2.6218: Turn off equipment when not in use $3,914 $1,050 $6,514
68,568
kWh
$(-2,600.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $21,289 $12,280 $21,289
224,091
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,055 $9,579 $7,055
74,259
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $570 $1,430 $570
6,002
kWh
-
07 2.9114: Use solar heat to make electricty $63,153 $568,008 $63,153
665,422
kWh
-
TOTAL RECOMMENDED $117,255 $595,974 $119,855
1,262,292
kWh
$(-2,600.0)
TOTAL IMPLEMENTED $46,478 $16,957 $49,078
516,609
kWh
$(-2,600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs