ITAC Assessment: SU0201
ITAC logo
ITAC Assessment: SU0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Small Package Pesticides
NAICS 325320: Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 220,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,809 1,111,745
kWh
Electricity Demand $61,413 4,102
kW-mo/yr
Natural Gas $49,974 6,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,721 - $1,538
18,536
kWh
$1,183
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $2,094 $142 $1,181
14,226
kWh
$913
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,555 $617 $881
10,620
kWh
$674
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $673 $461 $244
2,943
kWh
$60
-
kW-mo/yr
$369
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,182 $3,211 $4,017
48,399
kWh
$165
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,591 $20,054 $5,142
61,956
kWh
$5,449
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,816 $24,485 $13,003
156,680
kWh
$8,444
-
kW-mo/yr
$369
TOTAL IMPLEMENTED $9,131 $4,289 $6,680
80,498
kWh
$2,082
-
kW-mo/yr
$369
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs