Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Pesticides and Herbicides
NAICS 325320: Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 1,000,000
ft2
Annual Production 34,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $485,210 14,159,834
kWh
Electricity Demand $117,021 26,751
kW-mo/yr
Natural Gas $1,848,123 325,697
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,417,891 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,403,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $1,333,121 $2,700,000 $893,520
26,280,000
kWh
$157,320
-
kW-mo/yr
$336,281
-
MMBtu
$(-54,000.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,420 $29,400 $7,892
232,131
kWh
$2,528
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $7,249 - $5,361
157,680
kWh
$1,888
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,169 $10,500 $3,157
92,843
kWh
$1,012
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,420 $22,100 $7,892
232,131
kWh
$2,528
-
kW-mo/yr
- -
06 2.4131: Size electric motors for peak operating efficiency $39,206 $74,000 $29,699
873,503
kWh
$9,507
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,366 - $4,366
101,539
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,203 $6,441 $1,694
49,814
kWh
$509
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,977 $456 $2,994
69,627
kWh
- - $(-17.0)
10 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,760 - $2,360
69,420
kWh
$1,400
-
kW-mo/yr
- -
TOTAL RECOMMENDED $1,417,891 $2,842,897 $958,935
28,158,688
kWh
$176,692
-
kW-mo/yr
$336,281
-
MMBtu
$(-54,017.0)
TOTAL IMPLEMENTED $1,403,105 $2,820,797 $946,677
27,825,018
kWh
$174,164
-
kW-mo/yr
$336,281
-
MMBtu
$(-54,017.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs