ITAC Assessment: MO0285
ITAC logo
ITAC Assessment: MO0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Offset & Letterpress Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 30,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,879 2,047,186
kWh
Electricity Demand $28,381 629
kW-mo/yr
Electricity Fees $11,549 -
Natural Gas $5,448 910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,038 $2,194 $857
20,516
kWh
$181
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,532 $3,010 $1,261
30,188
kWh
$271
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,017 $40 $1,701
40,739
kWh
$316
-
kW-mo/yr
- -
04 3.5217: Reuse / recycle/ sell paper products $18,460 - - - $18,460
-
lb
-
05 3.7198: Reduce / eliminate use of disposable product $1,828 $2,880 - - $1,828
-
lb
-
06 3.1182: Make a new by-product $8,333 $5,600 - - - $8,333
07 4.423: Move product using mechanical means $13,426 $2,400 - - - $13,426
TOTAL RECOMMENDED $46,634 $16,124 $3,819
91,443
kWh
$768
-
kW-mo/yr
$20,288
-
lb
$21,759
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs