Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Agricultural chemicals
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0309 #07 Y:2026 Eliminate or reduce compressed air usage $390 $1,110
UU0309 #06 Y:2026 Use optimum size and capacity equipment $17,000 $39,000
UU0309 #05 Y:2026 Flash condensate to produce lower pressure steam $645,000 $402,000
UU0309 #04 Y:2026 Eliminate leaks in high pressure reducing stations $2,100 $1,650
UU0309 #03 Y:2026 Install / repair insulation on steam lines $6,100 $4,670
UU0309 #02 Y:2026 Operate distillation columns efficiently $186,000 $398,000
UU0309 #01 Y:2026 Modify workload $300,000 $288,000
MZ0396 #07 Y:2026 Install compressor air intakes in coolest locations $3,323 $8,500
MZ0396 #06 Y:2026 Replace boiler $232,201 $1,800,000
MZ0396 #05 Y:2026 Use solar heat to make electricty $95,236 $1,204,387
MZ0396 #04 Y:2026 Improve combustion control capability $201,607 $296,000
MZ0396 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $22,688 $26,142
MZ0396 #02 Y:2026 Lower temperature during the winter season and vice-versa $480 -
MZ0396 #01 Y:2026 Install occupancy sensors $606 $2,075
LE0584 #08 Y:2024 Preheat combustion air with waste heat $8,045 $30,000
LE0584 #07 Y:2024 Clean or color roof to reduce solar load $9,000 $31,500
LE0584 #06 Y:2024 Analyze flue gas for proper air/fuel ratio $1,853 $5,000
LE0584 #05 Y:2024 Install back-up equipment $148,846 $350,000
LE0584 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,377 $2,400
LE0584 #03 Y:2024 Install timers and/or thermostats $1,504 $600