ITAC Assessment: UF0618
ITAC logo
ITAC Assessment: UF0618
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Biobased Fertilizers
NAICS 325311: Nitrogenous Fertilizer Manufacturing
SIC 2873: Nitrogenous Fertilizers
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 50,970
ft2
Annual Production 10,000
ton
Production Hrs. Annual 2,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,278 162,000
kWh
Electricity Demand $4,615 1,056
kW-mo/yr
Electricity Fees $2,003 -
Natural Gas $14,714 1,050
MMBtu
LPG $11,758 225
MMBtu
Fuel Oil #2 $63,095 2,238
MMBtu
TOTAL YEARLY COSTS $109,463
RECOMMENDED SAVINGS* $503,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $19,157 $112,913 $13,284
162,000
kWh
$5,873
-
kW-mo/yr
- - - -
02 2.3192: Use fossil fuel powered generator during peak demand periods $1,789 $872 $1,328
16,200
kWh
$461
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $1,409 $5,855 $682
8,319
kWh
$727
-
kW-mo/yr
- - - -
04 4.114: Add/modify equipment to improve drying process $308,175 $14,388 - - $8,175
-
MMBtu
- $300,000 -
05 4.211: Consider use / purchase of bulk materials where possible $150,000 $70,000 - - - - - $150,000
06 2.7243: Improve air circulation with destratification fans / other methods $12,621 $12,380 $(-299.0)
(-3,650)
kWh
$(-184.0)
-
kW-mo/yr
- $13,104 - -
07 4.424: Improve space comfort conditioning $10,000 $1,931 $(-299.0)
(-3,650)
kWh
$(-184.0)
-
kW-mo/yr
- - $10,483 -
TOTAL RECOMMENDED $503,151 $218,339 $14,696
179,219
kWh
$6,693
-
kW-mo/yr
$8,175
-
MMBtu
$13,104 $310,483 $150,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs