ITAC Assessment: AM0470
ITAC logo
ITAC Assessment: AM0470
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Newspapers
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 458,000
ft2
Annual Production 240,000,000
pieces
Production Hrs. Annual 7,800
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $973,647 21,701,425
kWh
Electricity Demand $338,378 54,244
kW-mo/yr
Electricity Fees $22,835 -
Natural Gas $161,601 21,308
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.7131: Add area lighting switches $16,700 $2,300 $9,100
197,500
kWh
$7,600
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $16,400 $4,800 $12,700
274,000
kWh
$3,700
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $7,240 $21,700 $5,000
89,900
kWh
$700
-
kW-mo/yr
- - - $1,540
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,900 $14,200 n/a $8,700
205,700
kWh
$1,200
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,360 $38,000 $6,900
146,000
kWh
$2,400
-
kW-mo/yr
- $4,060 - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,140 $7,000 $4,500
108,000
kWh
$640
-
kW-mo/yr
- - - -
07 2.7124: Make a practice of turning off lights when not needed $5,070 $700 $4,240
89,900
kWh
$830
-
kW-mo/yr
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,430 $4,500 $4,000
86,000
kWh
$430
-
kW-mo/yr
- - - -
09 3.4154: Eliminate leaks in water lines and valves $4,000 $270 - - - - $4,000
-
Tgal
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,330 $3,700 $3,000
64,500
kWh
$330
-
kW-mo/yr
- - - -
11 2.4314: Use synthetic lubricant $3,000 - $2,500
47,230
kWh
$500
-
kW-mo/yr
- - - -
12 2.7261: Install timers and/or thermostats $2,730 $270 $950
15,260
kWh
- $1,780
-
MMBtu
- - -
13 2.2511: Insulate bare equipment $2,000 $350 - - $2,000
-
MMBtu
- - -
14 2.7134: Use photocell controls $1,030 $130 $690
14,600
kWh
$340
-
kW-mo/yr
- - - -
15 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $960 $1,100 $960
20,400
kWh
- - - - -
16 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $180 $400 $180
3,880
kWh
- - - - -
TOTAL RECOMMENDED $95,470 $99,420 $63,420
1,362,870
kWh
$18,670
-
kW-mo/yr
$3,780
-
MMBtu
$4,060 $4,000
-
Tgal
$1,540
TOTAL IMPLEMENTED $51,040 $10,190 $30,630
648,170
kWh
$12,630
-
kW-mo/yr
$3,780
-
MMBtu
- $4,000
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs