Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial organic chemicals, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1032 #08 Y:2021 Use waste heat from hot flue gases to preheat $351,582 $1,000,000
UD1032 #07 Y:2021 Install occupancy sensors $19,725 $23,544
UD1032 #06 Y:2021 Utilize energy-efficient belts and other improved mechanisms $4,104 -
UD1032 #05 Y:2021 Use optimum size and capacity equipment $14,725 $4,661
UD1032 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $68,929 $100,000
UD1032 #03 Y:2021 Install compressor air intakes in coolest locations $3,018 $10,000
UD1032 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $5,757 -
UD1032 #01 Y:2021 Install motor voltage controller on lightly loaded motors $58,668 $25,875
UD0966 #09 Y:2017 Use steam pressure reduction to generate power $76,595 $198,657
UD0966 #08 Y:2017 Use steam pressure reduction to generate power $229,882 $595,039
UD0966 #07 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $383,642 $613,600
UD0966 #06 Y:2017 Utilize energy-efficient belts and other improved mechanisms $14,748 $4,000
UD0966 #05 Y:2017 Reschedule and rearrange multiple-source heating systems $57,432 $35,000
UD0966 #04 Y:2017 Use or replace with energy efficient substitutes $8,225 $4,000
UD0966 #03 Y:2017 Improve combustion control capability $270,579 $100,000
UD0966 #02 Y:2017 Install timers and/or thermostats $12,245 $25,000
UD0966 #01 Y:2017 Use highest temperature for chilling or cold storage $217,648 $48,962
UD0750 #10 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $7,730 $20,000
UD0750 #09 Y:2006 Repair and eliminate steam leaks $24,000 $13,000
UD0750 #08 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $39,020 $135,999