ITAC Assessment: MS0463
ITAC logo
ITAC Assessment: MS0463
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Phenol Formaldehyde and Urea Formaldehyde
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 52
Plant Area 2,265,120
ft2
Annual Production 332,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $958,905 23,116,728
kWh
Electricity Demand $854,328 39,595
kW-mo/yr
Electricity Fees $28,116 -
Natural Gas $283,802 79,488
MMBtu
Waste Disposal Costs
Water Usage $54,080 33,532
Tgal
Water Disposal $26,400 33,532
Tgal
TOTAL YEARLY COSTS $2,205,631
RECOMMENDED SAVINGS* $16,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,666 $4,635 $3,666
88,370
kWh
02 2.7261: Install timers and/or thermostats $12,340 $1,339 $12,340
297,495
kWh
03 2.7135: Install occupancy sensors $910 $1,118 $910
21,939
kWh
TOTAL RECOMMENDED $16,916 $7,092 $16,916
407,804
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs