Assessment Year | 1994 |
---|---|
Principal Product | Rubber seals |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 345 |
Plant Area |
240,000
ft2
|
Annual Production | 46,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $372,105 | 10,324,443 |
kWh
|
$0.036 |
Natural Gas | $219,072 | 84,316 |
MMBtu
|
$2.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $263,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $187,111 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.1244: Reduce solution drag-out to prevent solution loss | $95,000 | $500 | - | - | $95,000 | |
02 | 2.6218: Turn off equipment when not in use | $68,825 | $500 |
$68,825
1,906,506
kWh
|
- | - | |
03 | 2.2121: Increase amount of condensate returned | $44,539 | $3,600 | - |
$44,539
-
MMBtu
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $20,848 | $35,460 |
$20,848
577,667
kWh
|
- | - | |
05 | 2.3212: Optimize plant power factor | $17,888 | $18,771 |
$17,888
-
kWh
|
- | - | |
06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $4,968 | $4,310 | - |
$4,968
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,789 | - |
$2,789
77,374
kWh
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,800 | $320 |
$2,800
77,667
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,598 | $2,403 |
$2,598
38,101
kWh
|
- | - | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,491 | $5,000 | - |
$2,491
-
MMBtu
|
- | |
11 | 2.2437: Recover waste heat from equipment | $800 | $500 | - |
$800
-
MMBtu
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $117 | $240 |
$117
3,224
kWh
|
- | - | |
TOTAL RECOMMENDED | $263,663 | $71,604 |
$115,865
2,680,539
kWh
|
$52,798
-
MMBtu
|
$95,000 | ||
TOTAL IMPLEMENTED | $187,111 | $22,494 |
$92,111
2,022,274
kWh
|
- | $95,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs