| Assessment Year | 1994 |
|---|---|
| Principal Product | daily newspaper |
| NAICS |
n/a
|
| SIC | 2711: Newspapers: Publishing, or Publishing and Printing |
| Sales Range | $1 M to 5M |
| # of Employees | 125 |
| Plant Area |
23,310
ft2
|
| Annual Production | 5,840,000
pieces
|
| Production Hrs. Annual | 2,288
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $39,534 | 334,701 |
kWh
|
$0.12 |
| LPG | $11,100 | 1,667 |
MMBtu
|
$6.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,617 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,609 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,261 | $2,533 |
$1,627
13,775
kWh
|
$(-366.0)
-
MMBtu
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $756 | $99 |
$756
6,448
kWh
|
- | - | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $2,970 | $886 | - |
$2,970
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $311 | $648 |
$311
2,638
kWh
|
- | - | |
| 05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $906 | $3,063 | - |
$906
-
MMBtu
|
- | |
| 06 | 3.8314: Purchase high materials in returnable bulk containers | $1,747 | - | - | - |
$1,747
-
lb
|
|
| 07 | 3.5217: Reuse / recycle/ sell paper products | $666 | $540 | - | - |
$666
-
lb
|
|
| TOTAL RECOMMENDED | $8,617 | $7,769 |
$2,694
22,861
kWh
|
$3,510
-
MMBtu
|
$2,413
-
lb
|
||
| TOTAL IMPLEMENTED | $5,609 | $5,236 |
$1,067
9,086
kWh
|
$3,876
-
MMBtu
|
$666
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs