ITAC Assessment: TT0007
ITAC logo
ITAC Assessment: TT0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Engineered Wood Products
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $100
M
to 500
M
# of Employees 145
Plant Area 205,000
ft2
Annual Production 425,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,956,974 64,235,204
kWh
Electricity Demand $931,433 70,638
kW-mo/yr
Natural Gas $2,287,645 276,044
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4227: Use compressor air filters $25,442 $42,225 $25,442
584,885
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,000 $10,900 $12,000
458,015
kWh
-
03 2.4227: Use compressor air filters $20,463 $2,000 $20,463
152,184
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $38,638 $57,958 $38,638
914,000
kWh
-
05 2.2113: Repair or replace steam traps $13,341 $4,000 $13,341
474,760
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,294 $480 $850
30,537
kWh
$444
-
kW-mo/yr
07 2.7142: Utilize higher efficiency lamps and/or ballasts $46,892 $73,290 $27,811
636,388
kWh
$19,081
-
kW-mo/yr
TOTAL RECOMMENDED $158,070 $190,853 $138,545
3,250,769
kWh
$19,525
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs