Assessment Year | 2001 |
---|---|
Principal Product | Rubber hoses, soakers, and sprinklers |
NAICS |
n/a
|
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
120,000
ft2
|
Annual Production | 1,200
thousand feet
|
Production Hrs. Annual | 4,776
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $229,669 | 4,069,520 |
kWh
|
$0.056 |
Electricity Demand | $25,916 | 10,562 |
kW-mo/yr
|
$2.45 |
Electricity Fees | $20,205 | - |
|
- |
Natural Gas | $12,373 | 1,505 |
MMBtu
|
$8.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $176,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $339 | $548 | n/a |
$159
3,979
kWh
|
$180
-
kW-mo/yr
|
- | - | - |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,345 | $120 | n/a |
$792
19,868
kWh
|
$553
-
kW-mo/yr
|
- | - | - |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,163 | $4,543 | n/a |
$599
19,399
kWh
|
$564
-
kW-mo/yr
|
- | - | - |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $961 | $30 | n/a |
$413
10,354
kWh
|
$548
-
kW-mo/yr
|
- | - | - |
05 | 3.5316: Contract a wood pallet recycling company | $23,040 | $60 | n/a | - | - | - | - | $23,040 |
06 | 4.513: Re-arrange equipment layout to reduce labor costs | $660 | $106 | n/a | - | - | $660 | - | - |
07 | 4.114: Add/modify equipment to improve drying process | $107,375 | $3,303 | n/a | - | - | - | $107,375 | - |
08 | 4.431: Train operators for maximum operating efficiency | $41,767 | $9,675 | n/a | - | - | $41,767 | - | - |
TOTAL RECOMMENDED | $176,650 | $18,385 |
$1,963
53,600
kWh
|
$1,845
-
kW-mo/yr
|
$42,427 | $107,375 | $23,040 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs