ITAC Assessment: AS0308
ITAC logo
ITAC Assessment: AS0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Rubber hoses, soakers, and sprinklers
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 120,000
ft2
Annual Production 1,200
thousand feet
Production Hrs. Annual 4,776
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,669 4,069,520
kWh
Electricity Demand $25,916 10,562
kW-mo/yr
Electricity Fees $20,205 -
Natural Gas $12,373 1,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $339 $548 n/a $159
3,979
kWh
$180
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,345 $120 n/a $792
19,868
kWh
$553
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,163 $4,543 n/a $599
19,399
kWh
$564
-
kW-mo/yr
- - -
04 2.7221: Lower temperature during the winter season and vice-versa $961 $30 n/a $413
10,354
kWh
$548
-
kW-mo/yr
- - -
05 3.5316: Contract a wood pallet recycling company $23,040 $60 n/a - - - - $23,040
06 4.513: Re-arrange equipment layout to reduce labor costs $660 $106 n/a - - $660 - -
07 4.114: Add/modify equipment to improve drying process $107,375 $3,303 n/a - - - $107,375 -
08 4.431: Train operators for maximum operating efficiency $41,767 $9,675 n/a - - $41,767 - -
TOTAL RECOMMENDED $176,650 $18,385 $1,963
53,600
kWh
$1,845
-
kW-mo/yr
$42,427 $107,375 $23,040
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs