| Assessment Year | 2026 |
|---|---|
| Principal Product | Surfactants |
| NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 219 |
| Plant Area |
54,000
ft2
|
| Annual Production | 29,800
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $199,675 | 2,395,377 |
kWh
|
$0.083 |
| Electricity Demand | $17,893 | 4,081 |
kW-mo/yr
|
$4.38 |
| Electricity Fees | $578 | - |
|
- |
| Natural Gas | $30,497 | 3,294 |
MMBtu
|
$9.26 |
| Other Gas | $716 | 1 |
MMBtu
|
$716.00 |
| TOTAL YEARLY COSTS | $249,359 | |||
| RECOMMENDED SAVINGS* | $57,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,007 | $22,000 |
$11,421
125,586
kWh
|
$15,586
-
MMBtu
|
|
| 02 | 2.2437: Recover waste heat from equipment | $7,918 | $10,000 | - |
$7,918
-
MMBtu
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,658 | $19,500 |
$12,658
139,098
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,007 | $5,500 |
$4,007
44,033
kWh
|
- | |
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $133 | $125 | - |
$133
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,492 | $4,837 |
$4,492
49,359
kWh
|
- | |
| 07 | 2.7234: Use heat pump for space conditioning | $1,195 | $14,500 |
$1,195
13,134
kWh
|
- | |
| TOTAL RECOMMENDED | $57,410 | $76,462 |
$33,773
371,210
kWh
|
$23,637
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs