Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gum and wood chemicals
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0501 #09 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,020 $482
UF0501 #08 Y:2016 Utilize daylight whenever possible in lieu of artificial light $5,834 -
UF0501 #07 Y:2016 Use optimum thickness insulation $6,596 $11,216
UF0501 #06 Y:2016 Moderate cooling tower outlet temperature $9,110 $700
UF0501 #05 Y:2016 Use most efficient type of electric motors $29,058 $39,050
UF0501 #04 Y:2016 Repair and eliminate steam leaks $32,236 $1,794
UF0501 #03 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $77,438 $2,184
UF0501 #02 Y:2016 Optimize plant power factor $154,176 $60,284
UF0501 #01 Y:2016 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,393,980 $3,306,000
MS0326 #04 Y:2008 Install / repair insulation on steam lines $14,110 $500
MS0326 #03 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $18,624 $376
MS0326 #02 Y:2008 Utilize energy-efficient belts and other improved mechanisms $48,711 $29,850
MS0326 #01 Y:2008 Repair and eliminate steam leaks $1,062,600 $94
OK0718 #08 Y:2005 Utilize higher efficiency lamps and/or ballasts $14,226 $66,500
OK0718 #07 Y:2005 Use optimum thickness insulation $2,162 $1,710
OK0718 #06 Y:2005 Insulate bare equipment $1,343 $1,693
OK0718 #05 Y:2005 Preheat boiler makeup water with waste process heat $2,243 $5,175
OK0718 #04 Y:2005 Analyze flue gas for proper air/fuel ratio $4,239 $8,030
OK0718 #03 Y:2005 Use compressor air filters $5,034 $459
OK0718 #02 Y:2005 Eliminate or reduce compressed air usage $13,021 $40,875