ITAC Assessment: MS0326
ITAC logo
ITAC Assessment: MS0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Pigment
NAICS 325130: Synthetic Dye and Pigment Manufacturing
SIC 2861: Gum and Wood Chemicals
Sales Range greater than $500
M
# of Employees 400
Plant Area 3,267,000
ft2
Annual Production 225,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,179,670 1,114,765,814
kWh
Natural Gas $18,465,453 2,462,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,144,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,095,334

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $1,062,600 $94 - $1,062,600
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $48,711 $29,850 $48,711
1,353,096
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,624 $376 $18,624
517,337
kWh
-
04 2.2136: Install / repair insulation on steam lines $14,110 $500 - $14,110
-
MMBtu
TOTAL RECOMMENDED $1,144,045 $30,820 $67,335
1,870,433
kWh
$1,076,710
-
MMBtu
TOTAL IMPLEMENTED $1,095,334 $970 $18,624
517,337
kWh
$1,076,710
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs