129
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Paints, varnishes, lacquers, enamels, and allied products | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0255 #05 Y:2003 | 05 | 2003 | Reduce the pressure of compressed air to the minimum required | $3,780 | $2,000 | |
| BD0255 #04 Y:2003 | 04 | 2003 | Use adjustable frequency drive or multiple speed motors on existing system | $7,576 | $13,050 | |
| BD0255 #03 Y:2003 | 03 | 2003 | Add equipment/ operators to reduce production bottleneck | $11,914 | $11,000 | |
| BD0255 #02 Y:2003 | 02 | 2003 | Install replacement doors | $13,961 | $14,000 | |
| BD0255 #01 Y:2003 | 01 | 2003 | Use most efficient type of electric motors | $16,352 | $17,885 | |
| IC0075 #07 Y:2003 | 07 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,105 | $2,900 | |
| IC0075 #06 Y:2003 | 06 | 2003 | Recover waste heat from equipment | $3,878 | $6,154 | |
| IC0075 #05 Y:2003 | 05 | 2003 | Reduce the pressure of compressed air to the minimum required | $1,066 | - | |
| IC0075 #04 Y:2003 | 04 | 2003 | Turn off equipment when not in use | $12,658 | $3,832 | |
| IC0075 #03 Y:2003 | 03 | 2003 | Install occupancy sensors | $4,538 | $6,945 | |
| IC0075 #02 Y:2003 | 02 | 2003 | Utilize higher efficiency lamps and/or ballasts | $3,794 | $12,470 | |
| IC0075 #01 Y:2003 | 01 | 2003 | Utilize higher efficiency lamps and/or ballasts | $7,225 | $17,812 | |
| IC0069 #08 Y:2003 | 08 | 2003 | Insulate glazing, walls, ceilings, and roofs | $31,618 | $251,040 | |
| IC0069 #07 Y:2003 | 07 | 2003 | Improve air circulation with destratification fans / other methods | $4,246 | $26,552 | |
| IC0069 #06 Y:2003 | 06 | 2003 | Redesign process | $579 | $1,984 | |
| IC0069 #05 Y:2003 | 05 | 2003 | Repair or replace steam traps | $6,176 | $341 | |
| IC0069 #04 Y:2003 | 04 | 2003 | Reduce combustion air flow to optimum | $10,894 | $10,560 | |
| IC0069 #03 Y:2003 | 03 | 2003 | Analyze flue gas for proper air/fuel ratio | $1,894 | $5,280 | |
| IC0069 #02 Y:2003 | 02 | 2003 | Install / repair insulation on steam lines | $4,983 | $8,812 | |
| IC0069 #01 Y:2003 | 01 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,411 | $2,200 |