Assessment Year | 2004 |
---|---|
Principal Product | Paint |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
120,000
ft2
|
Annual Production | 5
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $227,854 | 3,523,065 |
kWh
|
$0.065 |
Electricity Demand | $29,415 | 8,193 |
kW-mo/yr
|
$3.59 |
Electricity Fees | $5,688 | - |
|
- |
Natural Gas | $478,271 | 97,725 |
MMBtu
|
$4.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,264 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,105 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,225 | $17,812 |
$5,461
84,068
kWh
|
$814
-
kW-mo/yr
|
- | $719 | $231 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,794 | $12,470 |
$3,854
59,290
kWh
|
$417
-
kW-mo/yr
|
- | $(-496.0) | $19 | |
03 | 2.7135: Install occupancy sensors | $4,538 | $6,945 |
$4,418
67,978
kWh
|
$120
-
kW-mo/yr
|
- | - | - | |
04 | 2.6218: Turn off equipment when not in use | $12,658 | $3,832 |
$12,658
194,735
kWh
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,066 | - |
$990
15,233
kWh
|
$76
-
kW-mo/yr
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $3,878 | $6,154 | - | - |
$3,878
-
MMBtu
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,105 | $2,900 |
$5,669
87,257
kWh
|
$436
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $39,264 | $50,113 |
$33,050
508,561
kWh
|
$1,863
-
kW-mo/yr
|
$3,878
-
MMBtu
|
$223 | $250 | ||
TOTAL IMPLEMENTED | $6,105 | $2,900 |
$5,669
87,257
kWh
|
$436
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs