Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

525

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Perfumes, cosmetics, and other toilet preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0642 #08 Y:2023 Install compressor air intakes in coolest locations $3,587 $3,721
WV0642 #07 Y:2023 Use flue gases to heat process or service water $4,509 $11,550
WV0642 #06 Y:2023 Establish a predictive maintenance program $5,167 $1,500
WV0642 #05 Y:2023 Reduce the pressure of compressed air to the minimum required $5,435 $1,980
WV0642 #04 Y:2023 Install outside air damper / economizer on hvac unit $14,368 $70,000
WV0642 #03 Y:2023 Replace boiler $19,921 $90,000
WV0642 #02 Y:2023 Use or replace with energy efficient substitutes $23,931 $31,118
WV0642 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $27,969 $55,520
SD0621 #04 Y:2021 Chill water to the highest temperature possible $732 -
SD0621 #03 Y:2021 Use most efficient type of electric motors $1,020 $4,132
SD0621 #02 Y:2021 Use computer programs to optimize hvac performance $5,887 $10,000
SD0621 #01 Y:2021 Reduce illumination to minimum necessary levels $10,319 -
MI0397 #06 Y:2021 Eliminate leaks in water lines and valves $1,361 $40
MI0397 #05 Y:2021 Avoid introducing hot, humid, or dirty air into hvac system $1,631 $40
MI0397 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,160 $4,555
MI0397 #03 Y:2021 Meter waste water $2,172 $1,380
MI0397 #02 Y:2021 Air condition only space necessary $2,751 $480
MI0397 #01 Y:2021 Lower temperature during the winter season and vice-versa $5,589 $480
OK1060 #05 Y:2021 Optimize plant power factor $352 $1,500
OK1060 #04 Y:2021 Install sub-metering equipment $2,400 $992