525
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Perfumes, cosmetics, and other toilet preparations | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0642 #08 Y:2023 | 08 | 2023 | Install compressor air intakes in coolest locations | $3,587 | $3,721 | |
| WV0642 #07 Y:2023 | 07 | 2023 | Use flue gases to heat process or service water | $4,509 | $11,550 | |
| WV0642 #06 Y:2023 | 06 | 2023 | Establish a predictive maintenance program | $5,167 | $1,500 | |
| WV0642 #05 Y:2023 | 05 | 2023 | Reduce the pressure of compressed air to the minimum required | $5,435 | $1,980 | |
| WV0642 #04 Y:2023 | 04 | 2023 | Install outside air damper / economizer on hvac unit | $14,368 | $70,000 | |
| WV0642 #03 Y:2023 | 03 | 2023 | Replace boiler | $19,921 | $90,000 | |
| WV0642 #02 Y:2023 | 02 | 2023 | Use or replace with energy efficient substitutes | $23,931 | $31,118 | |
| WV0642 #01 Y:2023 | 01 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $27,969 | $55,520 | |
| SD0621 #04 Y:2021 | 04 | 2021 | Chill water to the highest temperature possible | $732 | - | |
| SD0621 #03 Y:2021 | 03 | 2021 | Use most efficient type of electric motors | $1,020 | $4,132 | |
| SD0621 #02 Y:2021 | 02 | 2021 | Use computer programs to optimize hvac performance | $5,887 | $10,000 | |
| SD0621 #01 Y:2021 | 01 | 2021 | Reduce illumination to minimum necessary levels | $10,319 | - | |
| MI0397 #06 Y:2021 | 06 | 2021 | Eliminate leaks in water lines and valves | $1,361 | $40 | |
| MI0397 #05 Y:2021 | 05 | 2021 | Avoid introducing hot, humid, or dirty air into hvac system | $1,631 | $40 | |
| MI0397 #04 Y:2021 | 04 | 2021 | Utilize higher efficiency lamps and/or ballasts | $1,160 | $4,555 | |
| MI0397 #03 Y:2021 | 03 | 2021 | Meter waste water | $2,172 | $1,380 | |
| MI0397 #02 Y:2021 | 02 | 2021 | Air condition only space necessary | $2,751 | $480 | |
| MI0397 #01 Y:2021 | 01 | 2021 | Lower temperature during the winter season and vice-versa | $5,589 | $480 | |
| OK1060 #05 Y:2021 | 05 | 2021 | Optimize plant power factor | $352 | $1,500 | |
| OK1060 #04 Y:2021 | 04 | 2021 | Install sub-metering equipment | $2,400 | $992 |