ITAC Assessment: SD0621
ITAC logo
ITAC Assessment: SD0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Color Cosmetics
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 4,950
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,603 833,474
kWh
Electricity Demand $29,571 2,960
kW-mo/yr
Electricity Fees $10,426 -
TOTAL YEARLY COSTS $157,600
RECOMMENDED SAVINGS* $17,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,206

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7111: Reduce illumination to minimum necessary levels $10,319 - $8,807
62,419
kWh
$1,512
-
kW-mo/yr
02 2.7226: Use computer programs to optimize hvac performance $5,887 $10,000 $5,213
36,947
kWh
$674
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $1,020 $4,132 $870
6,168
kWh
$150
-
kW-mo/yr
04 2.2625: Chill water to the highest temperature possible $732 - $614
4,352
kWh
$118
-
kW-mo/yr
TOTAL RECOMMENDED $17,958 $14,132 $15,504
109,886
kWh
$2,454
-
kW-mo/yr
TOTAL IMPLEMENTED $16,206 $10,000 $14,020
99,366
kWh
$2,186
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs