Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

503

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Perfumes, cosmetics, and other toilet preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0435 #01 Y:2023 Lower temperature during the winter season and vice-versa $28,034 $780
MI0432 #09 Y:2023 Install vinyl strip / high speed / air curtain doors $276 $1,150
MI0432 #08 Y:2023 Install / repair insulation on steam lines $678 $490
MI0432 #07 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $682 $1,953
MI0432 #06 Y:2023 Eliminate or reduce compressed air usage $1,952 $120
MI0432 #05 Y:2023 Analyze flue gas for proper air/fuel ratio $2,587 $1,360
MI0432 #04 Y:2023 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,728 $1,750
MI0432 #03 Y:2023 Clean or color roof to reduce solar load $2,131 $6,528
MI0432 #02 Y:2023 Lower temperature during the winter season and vice-versa $2,607 $580
MI0432 #01 Y:2023 Turn off equipment when not in use $7,559 $3,360
UU0230 #11 Y:2023 Utilize higher efficiency lamps and/or ballasts $13,121 $33,692
UU0230 #10 Y:2023 Reschedule plant operations or reduce load to avoid peaks $2,460 $1,000
UU0230 #09 Y:2023 Reschedule plant operations or reduce load to avoid peaks $2,682 $2,000
UU0230 #08 Y:2023 Turn off equipment during breaks, reduce operating time $9,790 $1,000
UU0230 #07 Y:2023 Recover waste heat from equipment $32,123 $20,174
UU0230 #06 Y:2023 Use heat from boiler blowdown to preheat boiler feed water $7,985 $11,730
UU0230 #05 Y:2023 Insulate bare equipment $4,607 $4,819
UU0230 #04 Y:2023 Install compressor air intakes in coolest locations $1,277 $2,970
UU0230 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $1,861 $1,200
UU0230 #02 Y:2023 Lower temperature during the winter season and vice-versa $8,818 $12,930