ITAC Assessment: UU0230
ITAC logo
ITAC Assessment: UU0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Health and beauty liquids/gels/powders
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 380,000
ft2
Annual Production 7,280,000
units
Production Hrs. Annual 3,640
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,302 1,625,760
kWh
Electricity Demand $10,003 1,343
kW-mo/yr
Electricity Fees $31,920 -
Natural Gas $206,377 14,601
MMBtu
TOTAL YEARLY COSTS $414,602
RECOMMENDED SAVINGS* $105,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,954

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,018 $26,647 $9,048
88,706
kWh
- $11,970
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $8,818 $12,930 - - $8,818
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,861 $1,200 $1,495
14,657
kWh
$366
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,277 $2,970 $1,277
12,515
kWh
- -
05 2.2511: Insulate bare equipment $4,607 $4,819 - - $4,607
-
MMBtu
06 2.1243: Use heat from boiler blowdown to preheat boiler feed water $7,985 $11,730 - - $7,985
-
MMBtu
07 2.2437: Recover waste heat from equipment $32,123 $20,174 - - $32,123
-
MMBtu
08 2.6212: Turn off equipment during breaks, reduce operating time $9,790 $1,000 - - $9,790
-
MMBtu
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,682 $2,000 - $2,682
-
kW-mo/yr
-
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,460 $1,000 - $2,460
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $13,121 $33,692 $12,147
119,086
kWh
$975
-
kW-mo/yr
-
TOTAL RECOMMENDED $105,742 $118,162 $23,967
234,964
kWh
$6,482
-
kW-mo/yr
$75,293
-
MMBtu
TOTAL IMPLEMENTED $81,954 $70,740 $11,820
115,878
kWh
$2,826
-
kW-mo/yr
$67,308
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs