Assessment Year | 2023 |
---|---|
Principal Product | Health and beauty liquids/gels/powders |
NAICS | 325620: Toilet Preparation Manufacturing |
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
380,000
ft2
|
Annual Production | 7,280,000
units
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $166,302 | 1,625,760 |
kWh
|
$0.10 |
Electricity Demand | $10,003 | 1,343 |
kW-mo/yr
|
$7.45 |
Electricity Fees | $31,920 | - |
|
- |
Natural Gas | $206,377 | 14,601 |
MMBtu
|
$14.13 |
TOTAL YEARLY COSTS | $414,602 | |||
RECOMMENDED SAVINGS* | $105,742 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,954 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,018 | $26,647 |
$9,048
88,706
kWh
|
- |
$11,970
-
MMBtu
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $8,818 | $12,930 | - | - |
$8,818
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,861 | $1,200 |
$1,495
14,657
kWh
|
$366
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,277 | $2,970 |
$1,277
12,515
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $4,607 | $4,819 | - | - |
$4,607
-
MMBtu
|
|
06 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $7,985 | $11,730 | - | - |
$7,985
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $32,123 | $20,174 | - | - |
$32,123
-
MMBtu
|
|
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,790 | $1,000 | - | - |
$9,790
-
MMBtu
|
|
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,682 | $2,000 | - |
$2,682
-
kW-mo/yr
|
- | |
10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,460 | $1,000 | - |
$2,460
-
kW-mo/yr
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,121 | $33,692 |
$12,147
119,086
kWh
|
$975
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $105,742 | $118,162 |
$23,967
234,964
kWh
|
$6,482
-
kW-mo/yr
|
$75,293
-
MMBtu
|
||
TOTAL IMPLEMENTED | $81,954 | $70,740 |
$11,820
115,878
kWh
|
$2,826
-
kW-mo/yr
|
$67,308
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs