ITAC Assessment: MA0610
ITAC logo
ITAC Assessment: MA0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Silicone extrusions moldings
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 28,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,339 746,091
kWh
Electricity Demand $35,876 3,025
kW-mo/yr
Electricity Fees $4,314 -
LPG $14,896 1,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,053 $49,555 $6,857
65,300
kWh
$2,196
-
kW-mo/yr
- -
02 4.111: Add equipment/ operators to reduce production bottleneck $5,760 $7,600 - - - $5,760
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,399 $10,600 $4,399
41,900
kWh
- - -
04 2.2437: Recover waste heat from equipment $3,743 $4,700 $4,263
40,600
kWh
- $(-520.0) -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,320 $2,782 $2,320
22,100
kWh
- - -
06 2.2511: Insulate bare equipment $94 $100 $94
900
kWh
- - -
TOTAL RECOMMENDED $25,369 $75,337 $17,933
170,800
kWh
$2,196
-
kW-mo/yr
$(-520.0) $5,760
TOTAL IMPLEMENTED $13,996 $23,000 $8,756
83,400
kWh
- $(-520.0) $5,760
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs