Assessment Year | 2007 |
---|---|
Principal Product | Silicone extrusions moldings |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
28,000
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,339 | 746,091 |
kWh
|
$0.10 |
Electricity Demand | $35,876 | 3,025 |
kW-mo/yr
|
$11.86 |
Electricity Fees | $4,314 | - |
|
- |
LPG | $14,896 | 1,012 |
MMBtu
|
$14.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,369 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,996 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,053 | $49,555 |
$6,857
65,300
kWh
|
$2,196
-
kW-mo/yr
|
- | - | |
02 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,760 | $7,600 | - | - | - | $5,760 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,399 | $10,600 |
$4,399
41,900
kWh
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $3,743 | $4,700 |
$4,263
40,600
kWh
|
- | $(-520.0) | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,320 | $2,782 |
$2,320
22,100
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $94 | $100 |
$94
900
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $25,369 | $75,337 |
$17,933
170,800
kWh
|
$2,196
-
kW-mo/yr
|
$(-520.0) | $5,760 | ||
TOTAL IMPLEMENTED | $13,996 | $23,000 |
$8,756
83,400
kWh
|
- | $(-520.0) | $5,760 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs