ITAC Assessment: UD0491
ITAC logo
ITAC Assessment: UD0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product school buses
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 560,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,307 4,039,566
kWh
Electricity Demand $105,600 13,200
kW-mo/yr
Natural Gas $56,609 13,693
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.2176: Increase use of automation $77,633 $500 - - - - $87,833
-
gal
$4,800
-
lb
$(-15,000.0) -
02 2.3212: Optimize plant power factor $3,570 $1,000 - $3,570
-
kW-mo/yr
- - - - - -
03 3.4151: Minimize water usage $8,472 $100 - - - $8,472
-
Tgal
- - - -
04 2.4239: Eliminate or reduce compressed air usage $1,164 - $914
30,481
kWh
- - - - - - $250
05 2.4239: Eliminate or reduce compressed air usage $7,796 $3,000 $2,460
82,063
kWh
$3,936
-
kW-mo/yr
- - - - - $1,400
06 2.2437: Recover waste heat from equipment $960 $5,000 $960
31,946
kWh
- - - - - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,234 $6,500 $7,898
263,189
kWh
$9,828
-
kW-mo/yr
$(-4,492.0)
-
MMBtu
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $25,229 $167,100 $13,613
454,279
kWh
$11,616
-
kW-mo/yr
- - - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,814 $21,315 $2,550
84,994
kWh
$3,264
-
kW-mo/yr
- - - - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $10,701 $49,200 $6,189
176,143
kWh
$4,512
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $154,573 $253,715 $34,584
1,123,095
kWh
$36,726
-
kW-mo/yr
$(-4,492.0)
-
MMBtu
$8,472
-
Tgal
$87,833
-
gal
$4,800
-
lb
$(-15,000.0) $1,650
TOTAL IMPLEMENTED $138,058 $183,200 $25,845
861,958
kWh
$28,950
-
kW-mo/yr
$(-4,492.0)
-
MMBtu
$8,472
-
Tgal
$87,833
-
gal
$4,800
-
lb
$(-15,000.0) $1,650
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs