Assessment Year | 1986 |
---|---|
Principal Product | CORRUGATED BOXES |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 72 |
Plant Area |
n/a
|
Annual Production | 110,000
thousand feet
|
Production Hrs. Annual | 4,030
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,557 | 922,919 |
kWh
|
$0.080 |
Natural Gas | $36,596 | 7,895 |
MMBtu
|
$4.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,572 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,721 | $40 | - |
$1,721
-
MMBtu
|
|
02 | 2.7243: Improve air circulation with destratification fans / other methods | $10,638 | $9,200 |
$(-1,612.0)
(-20,223)
kWh
|
$12,250
-
MMBtu
|
|
03 | 2.7231: Use radiant heater for spot heating | $7,549 | $15,000 | - |
$7,549
-
MMBtu
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,765 | $3,300 |
$4,765
59,789
kWh
|
- | |
05 | 2.4312: Improve lubrication practices | $3,995 | - |
$3,995
50,117
kWh
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $3,931 | $200 | - |
$3,931
-
MMBtu
|
|
07 | 2.7492: Use proper thickness of insulation on building envelope | $1,953 | $2,824 | - |
$1,953
-
MMBtu
|
|
08 | 2.1222: Install turbulators | $947 | $750 | - |
$947
-
MMBtu
|
|
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $934 | $200 |
$934
11,723
kWh
|
- | |
10 | 2.4221: Install compressor air intakes in coolest locations | $491 | $300 |
$491
6,155
kWh
|
- | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $584 | $20 |
$584
7,327
kWh
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,862 | $627 |
$1,862
23,447
kWh
|
- | |
TOTAL RECOMMENDED | $39,370 | $32,461 |
$11,019
138,335
kWh
|
$28,351
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,572 | $10,567 |
$5,670
71,219
kWh
|
$17,902
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs