ITAC Assessment: SD0332
ITAC logo
ITAC Assessment: SD0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Cardboard Boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 480,000
ft2
Annual Production 46,000
ton
Production Hrs. Annual 4,675
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,775 3,294,420
kWh
Electricity Demand $20,123 7,297
kW-mo/yr
Natural Gas $52,858 63,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $164,104 $609,600 $215,317
3,185,160
kWh
$16,825
-
kW-mo/yr
$(-24,170.0)
-
MMBtu
$(-43,868.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,679 $475 $1,679
24,832
kWh
- - -
03 2.2135: Repair and eliminate steam leaks $2,765 $900 - - $2,765
-
MMBtu
-
04 2.2441: Preheat boiler makeup water with waste process heat $1,750 $6,000 - - $1,750
-
MMBtu
-
05 2.7145: Install skylights $3,460 $7,015 $3,460
51,182
kWh
- - -
TOTAL RECOMMENDED $173,758 $623,990 $220,456
3,261,174
kWh
$16,825
-
kW-mo/yr
$(-19,655.0)
-
MMBtu
$(-43,868.0)
TOTAL IMPLEMENTED $4,444 $1,375 $1,679
24,832
kWh
- $2,765
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs