Assessment Year | 2004 |
---|---|
Principal Product | Cardboard Boxes |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
480,000
ft2
|
Annual Production | 46,000
ton
|
Production Hrs. Annual | 4,675
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $222,775 | 3,294,420 |
kWh
|
$0.068 |
Electricity Demand | $20,123 | 7,297 |
kW-mo/yr
|
$2.76 |
Natural Gas | $52,858 | 63,089 |
MMBtu
|
$0.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $173,758 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,444 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $164,104 | $609,600 |
$215,317
3,185,160
kWh
|
$16,825
-
kW-mo/yr
|
$(-24,170.0)
-
MMBtu
|
$(-43,868.0) | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,679 | $475 |
$1,679
24,832
kWh
|
- | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $2,765 | $900 | - | - |
$2,765
-
MMBtu
|
- | |
04 | 2.2441: Preheat boiler makeup water with waste process heat | $1,750 | $6,000 | - | - |
$1,750
-
MMBtu
|
- | |
05 | 2.7145: Install skylights | $3,460 | $7,015 |
$3,460
51,182
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $173,758 | $623,990 |
$220,456
3,261,174
kWh
|
$16,825
-
kW-mo/yr
|
$(-19,655.0)
-
MMBtu
|
$(-43,868.0) | ||
TOTAL IMPLEMENTED | $4,444 | $1,375 |
$1,679
24,832
kWh
|
- |
$2,765
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs