ITAC Assessment: MI0435
ITAC logo
ITAC Assessment: MI0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cosmetics
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $100
M
to 500
M
# of Employees 220
Plant Area 220,000
ft2
Annual Production 168,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,657 4,632,000
kWh
Electricity Demand $129,468 8,748
kW-mo/yr
Electricity Fees $70,763 -
TOTAL YEARLY COSTS $485,888
RECOMMENDED SAVINGS* $91,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7221: Lower temperature during the winter season and vice-versa $28,034 $780 $20,279
327,085
kWh
$7,755
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,484 $21,636 $14,097
227,363
kWh
$5,387
-
kW-mo/yr
03 2.7425: Clean or color roof to reduce solar load $7,206 $26,962 $5,741
92,603
kWh
$1,465
-
kW-mo/yr
04 2.7447: Install vinyl strip / high speed / air curtain doors $8,399 $1,690 $8,177
131,882
kWh
$222
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,069 $2,000 $7,287
117,532
kWh
$2,782
-
kW-mo/yr
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,992 $13,440 $4,334
69,903
kWh
$1,658
-
kW-mo/yr
07 2.7314: Reduce ventilation air $4,793 $5,900 $4,793
77,301
kWh
-
08 2.5195: Change product design to reduce energy requirements $4,360 $3,208 $3,154
50,873
kWh
$1,206
-
kW-mo/yr
09 2.3132: Recharge batteries on during off-peak demand periods $1,258 $1,532 - $1,258
-
kW-mo/yr
10 2.6218: Turn off equipment when not in use $1,011 - $730
11,780
kWh
$281
-
kW-mo/yr
11 2.7229: Air condition only space necessary $762 $770 $555
8,953
kWh
$207
-
kW-mo/yr
12 2.7135: Install occupancy sensors $297 $96 $297
4,792
kWh
-
TOTAL RECOMMENDED $91,665 $78,014 $69,444
1,120,067
kWh
$22,221
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs