ITAC Assessment: MI0039
ITAC logo
ITAC Assessment: MI0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aluminum windows, sliding doors, curtains and walls for high rise buildi
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 27
Plant Area 86,269
ft2
Annual Production 34,425
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,759 398,400
kWh
Electricity Demand $8,371 1,152
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $195,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 4.423: Move product using mechanical means $115,650 $10,000 n/a - - - $115,650
02 4.515: Install shelves / racks to utilize unused space $73,631 $42,600 n/a - - $73,631 -
03 2.7232: Replace existing hvac unit with high efficiency model $2,440 $3,600 n/a $1,505
22,464
kWh
$935
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,734 $1,300 n/a $1,734
25,881
kWh
- - -
05 2.7221: Lower temperature during the winter season and vice-versa $1,717 $7 n/a $1,717
25,623
kWh
- - -
TOTAL RECOMMENDED $195,172 $57,507 $4,956
73,968
kWh
$935
-
kW-mo/yr
$73,631 $115,650
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs