Assessment Year | 2024 |
---|---|
Principal Product | Cosmetics & Skin Care Products Manufacturing |
NAICS | 325620: Toilet Preparation Manufacturing |
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $50 M to 100M |
# of Employees | 115 |
Plant Area |
75,000
ft2
|
Annual Production | 25,000,000
pieces
|
Production Hrs. Annual | 2,354
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,445 | 540,611 |
kWh
|
$0.067 |
Electricity Demand | $31,388 | 2,561 |
kW-mo/yr
|
$12.26 |
Electricity Fees | $15,659 | - |
|
- |
Natural Gas | $22,606 | 1,861 |
MMBtu
|
$12.15 |
TOTAL YEARLY COSTS | $106,098 | |||
RECOMMENDED SAVINGS* | $21,200 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,372 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $7,559 | $3,360 |
$7,559
112,819
kWh
|
- | - | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $2,607 | $580 |
$2,085
31,124
kWh
|
$522
-
kW-mo/yr
|
- | |
03 | 2.7425: Clean or color roof to reduce solar load | $2,131 | $6,528 |
$1,704
25,433
kWh
|
$427
-
kW-mo/yr
|
- | |
04 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $2,728 | $1,750 |
$1,414
21,099
kWh
|
$1,314
-
kW-mo/yr
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,587 | $1,360 | - | - |
$2,587
-
MMBtu
|
|
06 | 2.4239: Eliminate or reduce compressed air usage | $1,952 | $120 |
$1,180
17,606
kWh
|
$772
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $682 | $1,953 |
$412
6,152
kWh
|
$270
-
kW-mo/yr
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $678 | $490 | - | - |
$678
-
MMBtu
|
|
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $276 | $1,150 |
$144
2,117
kWh
|
$132
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $21,200 | $17,291 |
$14,498
216,350
kWh
|
$3,437
-
kW-mo/yr
|
$3,265
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,372 | $11,841 |
$9,675
144,404
kWh
|
$697
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs