Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

503

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Perfumes, cosmetics, and other toilet preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0114 #07 Y:1997 Cross-train personnel to avoid lost time $13,910 -
SF0114 #06 Y:1997 Replace electrically-operated equipment with fossil fuel equipment $338 $920
SF0114 #05 Y:1997 Install compressor air intakes in coolest locations $181 $260
SF0114 #04 Y:1997 Reduce the pressure of compressed air to the minimum required $417 $675
SF0114 #03 Y:1997 Install occupancy sensors $235 $480
SF0114 #02 Y:1997 Use photocell controls $1,321 $1,000
SF0114 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $3,586 $10,740
KG0051 #10 Y:1995 Recover and reuse waste material $2,044 -
KG0051 #09 Y:1995 Recover and reuse waste material $2,930 $75
KG0051 #08 Y:1995 Minimize water usage $27,720 $3,283
KG0051 #07 Y:1995 Use synthetic lubricant $1,354 -
KG0051 #06 Y:1995 Utilize energy-efficient belts and other improved mechanisms $1,464 $1,120
KG0051 #05 Y:1995 Install timers and/or thermostats $1,859 $450
KG0051 #04 Y:1995 Analyze flue gas for proper air/fuel ratio $2,751 $1,500
KG0051 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $4,014 $1,052
KG0051 #02 Y:1995 Reduce illumination to minimum necessary levels $4,473 $2,080
KG0051 #01 Y:1995 Use most efficient type of electric motors $5,350 $3,820
HO0125 #04 Y:1995 Replace city water with recycled water via cooling tower $1,400 $5,000
HO0125 #03 Y:1995 Repair and eliminate steam leaks $175 $100
HO0125 #02 Y:1995 Use most efficient type of electric motors $5,138 $9,130