97
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Surface active agents, finishing agents, sulfonated oils, and assistants | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LE0498 #06 Y:2020 | 06 | 2020 | Analyze flue gas for proper air/fuel ratio | $1,503 | $7,000 | |
LE0498 #05 Y:2020 | 05 | 2020 | Preheat combustion air with waste heat | $11,592 | $40,000 | |
LE0498 #04 Y:2020 | 04 | 2020 | Replace existing hvac unit with high efficiency model | $1,427 | $3,800 | |
LE0498 #03 Y:2020 | 03 | 2020 | Install / repair insulation on steam lines | $5,147 | $9,248 | |
LE0498 #02 Y:2020 | 02 | 2020 | Replace broken windows and/or window sash | $226 | $50 | |
LE0498 #01 Y:2020 | 01 | 2020 | Change rate schedules or other changes in utility service | $6,052 | - | |
CL1910 #04 Y:2019 | 04 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $377 | $1,605 | |
CL1910 #03 Y:2019 | 03 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,387 | $1,900 | |
CL1910 #02 Y:2019 | 02 | 2019 | Install / repair insulation on steam lines | $2,189 | $2,205 | |
CL1910 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $6,560 | $23,063 | |
UD0934 #10 Y:2015 | 10 | 2015 | Install occupancy sensors | $1,058 | $330 | |
UD0934 #09 Y:2015 | 09 | 2015 | Utilize higher efficiency lamps and/or ballasts | $18,944 | $75,059 | |
UD0934 #08 Y:2015 | 08 | 2015 | Reduce ventilation air | $11,488 | $18,984 | |
UD0934 #07 Y:2015 | 07 | 2015 | Install compressor air intakes in coolest locations | $1,363 | $2,700 | |
UD0934 #06 Y:2015 | 06 | 2015 | Reduce the pressure of compressed air to the minimum required | $25,672 | $18,125 | |
UD0934 #05 Y:2015 | 05 | 2015 | Turn off equipment during breaks, reduce operating time | $3,084 | $2,000 | |
UD0934 #04 Y:2015 | 04 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $11,235 | $5,300 | |
UD0934 #03 Y:2015 | 03 | 2015 | Install / repair insulation on steam lines | $250 | $224 | |
UD0934 #02 Y:2015 | 02 | 2015 | Analyze flue gas for proper air/fuel ratio | $2,375 | - | |
UD0934 #01 Y:2015 | 01 | 2015 | Meter recycled water (to reduce sewer charges) | $51,417 | - |