ITAC Assessment: CL1910
ITAC logo
ITAC Assessment: CL1910
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Chemical batch blending
NAICS 325613: Surface Active Agent Manufacturing
SIC 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 225,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 4,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,388 1,050,584
kWh
Electricity Fees $14,324 -
Natural Gas $86,685 12,510
MMBtu
Waste Disposal Costs
Water Usage $7,578 1,983
Tgal
Water Disposal $8,750 1,983
Tgal
Other Liquid (haz) $7,169 9,582
gal
Solid Waste (haz) $874 30
lb
TOTAL YEARLY COSTS $233,768
RECOMMENDED SAVINGS* $12,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,560 $23,063 $6,560
63,693
kWh
02 2.2136: Install / repair insulation on steam lines $2,189 $2,205 $2,189
21,250
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,387 $1,900 $3,387
32,880
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $377 $1,605 $377
3,664
kWh
TOTAL RECOMMENDED $12,513 $28,773 $12,513
121,487
kWh
TOTAL IMPLEMENTED $12,513 $28,773 $12,513
121,487
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs